| |
| | The
new air traffic control tower structure sits atop a circular shaped roof installed
by Damus Roofing Systems Ltd. | |
| |
| |
This
photo (left) shows the completed section after the final laying of the roofing
material, properly insulated and sealed. | |
This
photo (right) shows the wood frame and fasteners on which the felt is laid and
then the final roofing system. | |
| |
A
long sectional view of the baggage arrival area of the terminal, the first (lower)
roof is an asphalt based roof, with the upper roof being the specialised metal
roofing material. | | |
A
close up of the guttering joint and the fastener, built to exacting standards
and designed to last for many years with low maintenance. |
Our
website is currently being re-constructed, please write or call us for further
info. The site will updated by mid-march 2006. Damus
Roofing Systems Caribbean Drive, Point Lisas Couva, Trinidad WI
| | |
©
2006 Damus Roofing Systems, All Rights Reserved. | |